Data Interpretation: Quiz

Directions (Q. 1-5): Study the table carefully to answer the questions that follow: 




1). What is the total number of children liking BB?
a)  17859
b)  16389
c)  21568
d)  12354
e)  20568
2). What is the approximate average number of women liking all the teams?
a)  15421
b)  17786
c)  18258
d)  16146
e)  19381
3). The number of men liking DD forms what per cent of men those liking PPN? (Rounded off to two digits after decimal)
a)  571.05%
b)  475.04%
c)  325.56%
d)  496.25%
e)  291.50%
4). The total number of women liking PP forms approximately what per cent of the total number of women liking all the teams?
a)  12.5
b)  15.4
c)  14.8
d)  19.6
e)  13.8
5). What is the ratio of total number of men liking BW to those liking PP?
a)  208 : 130
b)  130 : 208
c)  208 : 147
d)  170 : 152

e)  147 : 208


Directions (Q 6-10): Study the given table carefully to answer the following questions:

The table shows the time (in days) taken by five men who do different types of work




6). How many days would Rituraj, Amarkant and Prithusen take to construct a building when they work together?
a) 5 (4/5)days
b) 4 (1/3) days
c) 8 (1/2) days
d) 7 (53/181) days
e) 6 (2/3) days
7). How many days would Vishwamohan, Latiteshwar and Rituraj take to install 10 towers when they work together?
a) 90 days
b) 88.13 days
c) 92.92 days
d) 87 days
e) 85.41 days
8).The bridge construction work is initiated by Rituraj, Prithusen and Latiteshwar together. After four days Laliteshwar leaves the work and Amarkant joins them. In how many days will the work be completed?
a) 7 (13/25) days
b) 5 (72/143) days
c) 10 (68/138) days
d) 4 (24/65) days
e) 12 (12/65) days
9).What would be the time taken to construct 5 buildings and 4 different roads when Rituraj, Prithusen and Vishwamohan work together?
a) 65.61 days
b) 61.53 days
c) 64.45 days
d) 62.63 days
e) 68.32 days
10). Rituraj and Amarkant got Rs 50000 for building construction. What is the share of Rituraj?
a) Rs 25000
b) Rs 26190.47
c) Rs 24130.5
d) Rs 22990.7
e) Rs 28970.5


Answers:


1). Required number = (45525 × 36)/100 = 16389
Answer is: b)

2). Number of women liking
Total = 155050
Required average= 155050/8
=19381.25 = 19381
Answer is: e)

3). Number of men liking DD = 45% of 56340
= (45 × 56340)/100 = 25353
Number of men liking PPN = 15% of 355080
= (15 × 355080)/100 = 5337
Required percentage
= (25353/5337) × 100 = 475.04%
Answer is: b)

4). Required percentage = (Number of women liking PP /Number of women liking all teams) × 100
= (21252/155050) × 100
= 13.8%
Answer is: e)

5). Required ratio = (36800 × 39)/100 : (48300 × 21)/100
= 14352 : 10143
= 208 : 147
Answer is: c)


6). Answer: d)
Part of building construction by Rituraj in one day = 1/20 by Amarkant = 1/22 and by Prithusen = 1/24
Work of building construction done in 1 day by all three together= (1/20 + 1/22 + 1/24) = 181/1320
ie, they construct a building in 1320/181 = 7 (53/181)  days

7).Answer: b)
The part of work of tower installation done by Vishwamohan in one day = 1/24, that Laliteshwar in one day = 1/30 and that by Rituraj in one day = 1/26
The part work of tower installation done by all three together in one day
=1/24 + 1/30 + 1/26 = 177/1560
:. 1 tower installation work is done in 1560 /177 days
:. 10 tower installation work is done in (1560 ×10)/177 = 88.13 days



8). Answer: d)
The part of work of bridge construction done by Rituraj, Prithusen and Laliteshwar  in 4 days
= (1/24 + 1/30 + 1/26) × 4 = (177 × 4) / 1560 = 708/1560 =59 / 130
The part of work of bridge construction done by Rituraj, Prithusen and Amarkant in one day
= (1/24 + 1/30+ 1/20) = (5 + 4 + 6)/120 = 1/8
After 4 days the remaining work = 1- (59/130) = (130 – 59)/130 = 71/130
Now, 71/130 work is done by Rituraj, Prithusen and Amarkant in
(71/130) / (1/8) = (71 × 8)/130= 568/130 = 4 (24/65) days

9). Answer: d)
When Rituraj, Prithusen and Vishwamohan work together, the work of building construction done by them =
(1/20 + 1/24 + 1/18) = 53/360
Per day work of road construction =
(1/18 + 1/22 +1/26) = 359/2574
53/360 part of building construction work is done in 1 day.
5 buildings are constructed in [360/53) × 5] = 33.96 days
359/2574 part of road construction is done in 1 day.
4 roads are constructed in [2574/359) × 4] = 28.67 days
:. Total time taken = (33.96 + 28.67) = 62.63 days

10). Answer: b)
Ratio of work done by Rituraj to that by Amarkant in one day in building construction
 Or, Rituraj: Amarkant = 1/20 : 1/22 = 11 : 10
Total wage = 500000
:. Share of Rituraj = 50000 × (11/21) = Rs 26190.47